How to set up a vibration table

2017-12-06

Vibrating table instructions

1.Installation:

Zhengzhou LYA Mould Co.,Ltd.a. Before installation,check the vibrating motor whether it is loose or not,then make table foot fix on the pre-concrete foundation,note that one side higher a little,and another sie should be lower a little.Slope degree=5-60,then the moulds will move from the top side to lower one.

 

b. Link the wire(A,B,C ,3 phases) with motor in the right way,prohibit the motor reverse rotation,if happened,stop at once and change wire linking until right rotation.

 

 

Technical data:

Name

Model

Vibrating capacity(kg)

Power (kw)

Dimension(mm)

Vibrating table

LYMP2500-3000

1000-1500

1.5-3

2500-3000*1000*800

2.Equipment maintainance:

a. In order to increase the working efficiency and lengthen the working life,the mechanic should check whether the vibrating motor and bolt is loose or not.

 

b. Clean up the waste concrete in the spring, and painting the smooth on the surface of vibrating table in a at regular intervals.

 

c.The workers should develop the habit to check the machine before and after working,add smooth oil to the related section of all machines.

Note:Overloading working is strictly prohibited, lead to some accidents by this,the user will take full responsibility.


CONTACT US



  198 floor 17 sheng long you yi cheng Building A Kuexue & Changchun Rd,Gaoxin district ,Zhengzhou ,Henan Province ,China.

   +8615225163054

  申博体育Harvey_lya@ahimut.com

   harveyzhang007   harveyzhang007

harveyzhang007 +86-15225163054
山东群英会 芒果体育 皇冠体育网 bbin体育 山东群英会出号走势图